Twamev Construction and Infrastructure Limited

Ongoing Projects

Home > Ongoing Projects

Existing commitments and on-going construction works:

Description of Work Name & Address of the Employer Place & State LOA/ Contract No & Date Value of Contract (Rs. In Crore)
Greater Shillong Water Supply Project (Phase – III) under JNNURM
“Chief Engineer, PHED, LowerLachumiere, Shillong, Meghalaya”
Shillong, Meghalaya
“PHE/Megh/ GSWS PP-III/ 2009-10/01 Dt. 29/01/2010”
“Original 51.40 Revised 78.19”
Up-gradation of Saiha – Lungbun – Tluangram – Haka Road in the State of Mizoram under North East Road Sector Development Scheme (NERSDS) on EPC mode
Office of the Chief Engineer Roads, PWD, Mizoram, Aizawl
“Saiha, Mizoram”
“AGM-3/EPC/CE-R/ 2021-22 dt. 15.09.2021”
43.08
Construction of Chainpur Road Over Bridge (ROB) in lieu of L/C No. 26/Spl/T at Km. 80/1-2 in between Chandrapura – Barkakana route in CIC Section of Dhanbad Division.
“Adminstrative Officer, Construction, East Central Railway, Mahendrughat Patna, 800004”
“Dhanbad, Jharkhand”
“ECR/CAO/Con/WT/ Agt./South/564 Dtd. 22.07.2024”
42.39
“Construction of RCC Bridge (Length – 140 m.) over river Manu on Sonaimuri-Telia Road (Job No-TP/COM/252/08-09)/ Balance Work.”
“Office of the Executive Engineer PWD (R&B), Kumarghat Div. Unakoti, Tripura”
“Agartala, Tripura”
“AGM-3/EPC/ CE-R/2021-22 Dt. 15.09.2022”
6.79
“Construction of Major Bridge Nos. 234 (5×12.20m Composite Girder) at Km: 205.398, 235 (9×18.30m Composite Girder) at Km: 206.45, 238 (3×12.20m Composite Girder) at Km: 208.754 and 239 (2×12.2m+2×18.30m Composite Girder) at Km: 209.367 in between Basta and Rupsa including Foundation, Substructure, Superstructure and other misc. works in connection with proposed 3rd line between Narayangarh – Bhadrak section of S. E. Railway. Estimate No.1792W/2019.”,
“11, Garden Reach Road, South Eastern Railway, Kolkata- 700043 West Bengal, India”
“Basta, Odisha”
“SER/CON/ HQ/KGP/23/2022 Dtd. 18.07.2022”
“Original 42.19 Revised 41.55”
“Construction of Kailasahar District Jail at Kailasahar, Unakoti District, Tripura / SH: Construction of i] 100 Seated Prisoners Ward (Male) ii] 25 Seated Prisoners Ward (Female) iii] 10 Seated Prisoners Cell iv] Administrative Block v] Office & Visitor room vi] Guard room vii] Kitchen Room viii] Dining Hall ix] Barrack for 15 person x] Internal boundary wall xi] Internal boundary wall surrounding female ward xii] Perimeter Wall xiii] Watch Tower and xiv] Staff Quarters {Type-I – 8 Units – (02 Block twin-double storied), Type-II – 8 Units – (02 Block twin-double storied) & Type – III- 8 Units – (02 Block twin-double storied)}/Building portion including internal water supply and sanitary installation / Balance work.(5th call).”
“PWD (R&B) Kailashahar Div. Unakoti Tripura”
“Kailashahar, Tripura”
“56/CE/EE/K2SD/PWD/ 2022-23 Dt. 23.02.2023”
5.87
(A) Construction of (i) a Flyover Bridge No.481A of Span 1×61.00+2×30.5m Open Web Through Girder at Ch.2000 (ii) Major Bridge No.481B of span 1×6.50+1×30.50+1×6.50m Composite Girder at Ch.2228.22 (iii) Major Bridge No.481D of span 1×18.30m Composite Girder at Ch.3024 and (iv) Major Bridge Np.8 of span 1x 61.0m Open Web Through Girder between Haridaspur and Chadikhole of Haridaspur-Paradeep Line. (B) Construction of a Flyover Bridge No.4 of span 1×60.10+30.50m at Ch.1569 between Siju and Paradeep coaching yard to avoid surface crossing of trains under KUR Division of East Coast Railway
“CE/CON-III/ECOR 2nd Floor, North Block Samanta Bihar Chandrasekharpur Bhubaneshwar 751017 Odisha”
“Paradeep, Odisha”
“ECoR/ECORC/Civil /2024/0002 Dt. 09.01.2024”
62.60
“Construction of 07 (seven) nos. Residential Quarters for Judicial Officers at Various Grade [Grade III – 4 nos. (Two block- 4 units- Double storied), Grade II – 3 nos. (One block- 3 units- Double storied)] at Kailashahar, Unakoti District, Tripura./ SH: Building portion including Internal water supply, Sanitary Installation, Sewage, Drainage works, Underground tank, Boundary wall and Internal Electrification Works.(4th Call)”
“PWD (R&B) Kailashahar Div. Unakoti Tripura”
“Kailashahar, Tripura”
“F.22(07)/EE/KLSD/ PWD(R&B) Dtd. 19.01.2024”
7.40
“Construction of RCC bridge over Abhayacherra on Barpathari to Tulamura road at Ch.4.50 KM (Job No.TP/COM/1/2012-13) for implementation under NABARD (RIDF-XII) (Length=43.120 m)/ Balance Work.”
“PWD (R&B) Belonia Div. Tripura”
“Belonia, Tripura”
“Loa No. F.7(7)/EE(PWD)/BLN/ DIV/2321-25 Dtd. 27.08.2024”
3.74